Consultation
We are now consulting the community and stakeholders on our draft planning application.
The statutory consultation runs from Thursday 6 March to Monday 21 April 2025.
This statutory consultation will give you the opportunity to examine our latest proposals and provide your comments / responses for our consideration before this Development of National Significance (DNS) application is finalised and submitted to Planning Environment Decisions Wales.
Drop in events
We’re holding drop in events where you can find out how our proposals have evolved since our informal consultation, discuss the draft application and ask our team any questions you may have.
Monday 24 March 2025, 2:00pm – 7:00pm at Treforest Community Centre
Tuesday 25 March 2025, 11:30am – 4:30pm at Rhydyfelin Community Centre
We welcome your views on the proposals and hope to see you at one of our events.
Feedback
We invite you to provide feedback on our draft planning application.
Please provide feedback to us by completing your feedback form by Monday 21 April 2025.
Paper copies of the feedback form can be sent to Freepost GRASSHOPPER CONSULT (no stamp or further address required).
After the consultation has closed, we will prepare a consultation report demonstrating how we have reviewed and responded to all the feedback received. This report will accompany the planning application which will be submitted to Planning and Environment Decisions Wales (PEDW) for determination.
Any information provided will only be used for the purpose of the planning application to the Planning and Environment Decisions Wales (PEDW). Your contact details will not be listed within the planning application documentation. Please complete General Data Protection Regulation section on the feedback form to indicate whether you wish to be kept informed by PEDW of future consultations on the application.
Feedback from the statutory consultation, along with the results of a range of site investigations and surveys, will help us refine our proposals ready for submission of the final planning application to Planning Environment Decisions Wales (PEDW) for consideration.
During PEDW’s examination of the planning application you will have an opportunity to review and comment on the final proposals.
Project Documentation
Statutory consultation on Glyn Taff Solar Farm runs from Thursday 6 March 2025 to Monday 21 April 2025.
Download Exhibition Boards PDF (15.7MB)
Download Non Statutory Consultation Report PDF (8.4MB)
View the planning application documents in full below
- EIA Volume 1 – Non Technical Summary
- EIA Volume 2 – Technical Chapters
- EIA Chapter 01 – Introduction
- EIA Chapter 02 – Development Description and Reasonable Alternatives
- EIA Chapter 03 – Planning Policy Context
- EIA Chapter 04 – Landscape and Visual Impact Assessment
- Chapter 4 – Landscape and Visual Impact Assessment.pdf
- Appendices
- Appendix 4A Figures
- Figure 4.1a – LANDMAP Visual and Sensory Aspect Areas.pdf
- Figure 4.1b – LANDMAP Visual and Sensory Overall Rating.pdf
- Figure 4.2 – Landscape Designations.pdf
- Figure 4.3 – Visual Designations with Viewpoints and ZTV.pdf
- Figure 4.3b – Viewpoints Locations.pdf
- Figure 4.4 – VP01 & VP02.pdf
- Figure 4.5 – VP03 & VP04.pdf
- Figure 4.6 – VP05 & VP06.pdf
- Figure 4.7 – VP07 & VP08.pdf
- Figure 4.8 – AVP1 & AVP2.pdf
- Figure 4.9 – AVP3 & AVP4.pdf
- Figure 4.10 – AVP5 & AVP6.pdf
- Figure 4.11 – AVP7 & AVP8.pdf
- Figure 4.12 – Photomontage VP1_compressed.pdf
- Figure 4.13 – Photomontage VP2_compressed.pdf
- Figure 4.14 – Photomontage VP3_compressed.pdf
- Figure 4.15 – Photomontage VP4_compressed.pdf
- Figure 4.16 – Photomontage AVP1_compressed.pdf
- Figure 4.17 – Photomontage AVP2_compressed.pdf
- Figure 4.18 – Photomontage AVP4_compressed.pdf
- Figure 4.19 – Photomontage AVP6_compressed.pdf
- Figure 4.20 – Photomontage AVP7_compressed.pdf
- Figure 4.21 – Photomontage AVP8_compressed.pdf
- Figure 4.22a – LEMP.pdf
- Figure 4.22b – LEMP.pdf
- Figure 4.22c – LEMP.pdf
- Figure 4.22d – LEMP.pdf
- Figure 4.22e – LEMP.pdf
- Appendix 4B Methodology
- Appendix 4A Figures
- EIA Chapter 05 – Hydrology
- EIA Chapter 06 – Highways and Transport
- EIA Chapter 07 – Glint and Glare
- Chapter 7 Glint and Glare.pdf
- Appendices
- Appendix 7A – Figure 7.1 – Residential Based Receptors (1).pdf
- Appendix 7A – Figure 7.2 – Road Based Receptors (1).pdf
- Appendix 7A – Figure 7.3 – Rail Based Receptors (1).pdf
- Appendix 7A – Figure 7.4 – Byway Based Receptors (1).pdf
- Appendix 7A – Figure 7.5 – Panel Area Labels (1).pdf
- Appendix 7B – Residential Receptor Glare Results 5 degrees (1).pdf
- Appendix 7C – Residential Receptor Glare Results 25 degrees (1).pdf
- Appendix 7D – Road Receptor Glare Results 5 degrees (1).pdf
- Appendix 7E – Road Receptor Glare Results 25 degrees (1).pdf
- Appendix 7F – Rail Receptor Glare Results 5 degrees (1).pdf
- Appendix 7G – Rail Receptor Glare Results 25 degrees (1).pdf
- Appendix 7H – Byway Receptor Glare Results 5 degrees (1).pdf
- Appendix 7I – Byway Receptor Glare Results 25 degrees (1).pdf
- Appendix 7J – Visibility Assessment Evidence (1).pdf
- Appendix 7K – Solar Module Glare and Reflectance Technical Memo (1).pdf
- EIA Chapter 08 – Noise
- EIA Chapter 09 – Ecology
- EIA Chapter 10 – Cultural Heritage and Archaeology
- Chapter 10 – Cultural Heritage and Archaeology Final.pdf
- Appendices
- Appendix 10A; Figure 10.1 – Heritage Assets within 5km.pdf
- Appendix 10A; Figure 10.2 – Heritage assets within 1km.pdf
- Appendix 10A; Figure 10.3 – Non-designated Heritage Assets.pdf
- Appendix 10A; Figure 10.4 – Heritage Assets in Close Proximity.pdf
- Appendix 10A; Figure 10.5 – Tithe Apportionment Map (1839).pdf
- Appendix 10A; Figure 10.6 – OS 1885 Map.pdf
- Appendix 10A; Figure 10.7 – OS 1901 Map.pdf
- Appendix 10A; Figure 10.8 – Lidar Data.pdf
- Appendix 10A; Figure 10.9 – Aerial Imagery 1969.pdf
- Appendix 10B – Table of Heritage Assets.pdf
- Appendix 10C – Photographic Register.pdf
- Appendix 10D – Cover Sheet.pdf
- Appendix 10D – Geophysical Survey Report_compressed.pdf
- EIA Chapter 11 – Climate Change
- EIA Chapter 12 – Mining
- EIA Chapter 13 – Summary of Effects and Mitigation
- EIA Volume 3 – Annexes
- Annex 1 – Flood Risk and Drainage Assessment
- Vol 3 – Annex 1 – Flood Consequence Assessment and Drainage Strategy.pdf
- Appendices
- Appendix 1A – Figures
- Appendix 1B – Flow Report
- Annex 2 – Outline Construction Environmental Management Plan
- Annex 3 – Construction Traffic Management Plan
- Annex 1 – Flood Risk and Drainage Assessment
- EIA Volume 4 – Figures
- Figure 1 – Site Location Map.pdf
- Figure 2 – Site Location & Site Notices.pdf
- Figure 2.1 – Site Location & Site Notices (Sheet 2).pdf
- Figure 2.2 – Site Location & Site Notices (Sheet 3).pdf
- Figure 3 – Field Numbers.pdf
- Figure 4 – Indicative Infra Layout A3.pdf
- Figure 5 – Indicative Infra Layout A1.pdf
- Figure 6 – Access Track Detail.pdf
- Figure 7 – Temporary Construction Compound.pdf
- Figure 8 – PV Module & Rack Detail.pdf
- Figure 9 – Security Fencing.pdf
- Figure 10 – CCTV.pdf
- Figure 11 – Transformer.pdf
- Figure 12 – Aux Transformer.pdf
- Figure 13 – Substation.pdf
- Figure 14 – Monitoring House.pdf
- Figure 15 – Storage Container.pdf
- Planning Reports
- Design and Access Statement
- Planning Statement
- Planning Statement FINAL.pdf
- Appendices
- Appendix A – Pre-Application Response
- Appendix B – EIA Screening Direction
- Appendix C – Acceptance of Application